FINAL YEAR PROJECT 2 : VACUUM CLEANER ROBOT

Tuesday, November 6, 2012

Week 10 : Continue from previous week 9 :The Frame/ body and Hard ware Design of the Vacuum Cleaner Robot


The Circuit had been placed on the robot :


The switch to ON and OFF the robot and the Vacuum Cleaner which the right is for robot and the left is for Vacuum :


All the assembly is done :



Posted by AmirulAcap at 10:12 PM
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

About Me

My photo
View my complete profile

Blog Archive

  • ▼  2012 (22)
    • ▼  November (15)
      • Video of my FYP
      • Week 14 : The D – day
      • Week 13 : The Born of what so called Vacuum Clean...
      • Week 12 : The Casing and Appearances Design of th...
      • Week 11 : Continue from previous week 10 :The Fra...
      • Week 10 : Continue from previous week 9 :The Frame...
      • Week 9 : The Frame/ body and Hard ware Design of t...
      • Week 8 : Put the Vacuum onto the robot for its app...
      • Week 7 : The PCB Drill and Soldering Week
      • Week 6 : The Layout and Etching
      • Week 5 : Obtaining the required electronic component
      • Week 3 and 4 : The Programming for the movement of...
      • Week 2 : The important week of all
      • FYP 2 Week 1 : From Idea to realisation
    • ►  April (7)
Watermark theme. Powered by Blogger.